- Cargo pallet
- ESD cotton bag to avoid chip damage
- Bubble wrap to buffer the board from accident press
- Dry PCB before packing
Read More: Logistics
#PCB Assembly
Read More: Logistics
#PCB Assembly
We found that edge-mounting a TO-Can package to a PCB will really save a lot on manufacturing. However, it comes with fairly long through-hole pins that are taking up too much space to reach the pads. Any suggestion?
A batch of PCB got wet in warehouse due to roof linking. Too terrible to shoulder the lost. How can I do to rescue these wet PCBs? Or to minimize the damage?
We have a project on new production which is based on PCB including esp32. How can our hardware engineer program it after PCBA process by supplier?
Markets
Contact Us
Copyright ©2025 MOKO Technology | Your Trusted EMS Partner 粤ICP备15085690号